METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION

FOR THE GAINESVILLE URBANIZED AREA

ADOPTED YEAR 2020 COST FEASIBLE PLAN

[Legend - Shaded Projects are not funded in the Cost Feasible Plan and Denotes Proposed to be State funded]



PRIORITY

RANKING





PROJECT




FROM




TO




DESCRIPTION
ESTIMATED COST ($M)

Eligible Fund Codes

1 Continue existing bus system and headways not applicable not applicable Existing Headways $ 17.5

DDR, DS, FTA, LF

2

FUNDED

Long range transit peer evaluation study not applicable not applicable Metropolitan areawide long range transit service evaluation $ 0.2

D, FTA, PL, LF

3 SW 20th Avenue/

Hull Road Extension

SW 62nd Boulevard SW 34th Street

(SR 121)

Four-lane existing or

new four-lane alignment (to be determined by P.D. & E)

$ 6.7

XA, XL, LF

4 Depot Avenue

Corridor (Proposed State Road 24)

SW 13th Street

(US 441)

Hawthorne Road

(SR 20)

Four-laning $ 18.8

XA, XL, LF

5

FUNDED

NW 39th Avenue

SR 222/CR 222

NW 98th Street End of 4 lane Four-laning and widen bridge $ 12.3a

XA, XL, LF

6 W University Avenue/ SW 2nd Avenue

(SR 26/SR 26A)

NW 38th Street North-South Drive Four lane SR 26A from

W 38th Street to SW 34th Street and One Way Pairs east of 34th Street

$ 5.9

DS,DDR, XA, XL, LF

7 Enhanced bus service via SW 20th Avenue Oaks Mall (via SW 62nd Boulevard) Central UF campus Frequent service;

limited stops

$ 3.8

DS, DDR, FTA, LF

8 Enhanced bus service via Archer Road Park-and-Ride lot west of I-75 Shands area and Central UF Campus Frequent service;

limited stops

$ 2.2

DS, DDR, FTA, LF

9 Tower Road End of 4 lane End of 4 lane Four-laning $ 9.8
10 NW 34th Street

(SR 121)

W University Avenue

(SR 26)

Martin Luther King, Jr. Highway

(US 441)

Corridor capacity enhancement strategies $ 5.0
11 Enhanced bus system not applicable not applicable Minimum 30 minute

peak headway

$ 13.2
12 SW 24th Avenue SW 75th Street SW 62nd Blvd Four-laning $ 10.0
13 Enhanced bus service via Newberry Road Tower Road/

Newberry Road/

Oaks Mall Park-and-Ride lot

University of Florida and Shands area Frequent service;

limited stops;

Park-and-Ride lot

@ Oaks Mall

$ 2.7
14 Newberry Road

(SR 26)

NW 76th Boulevard I - 75 Corridor capacity enhancement strategies $ 1.0
15 NW 83rd Street NW 23rd Avenue NW 39th Avenue Four-laning $ 2.6
16 Archer Road

(SR 24)

Parker Road SW 75th Street

(Tower Road)

Four-laning $ 11.3
17 NW 23rd Avenue NW 83rd Street NW 55th Street Four-laning $ 3.6
18 NW 23rd Avenue

Extension

NW 143rd Street NW 98th Street New two-lane road $ 1.5
19 SW 62nd Boulevard SW 20th Avenue End of 4 lane Four-laning $ 1.5
20 NW 53rd Avenue NW 43rd Street US 441 Four-laning or capacity enhancement strategies

(to be determined by P.D. & E)

$ 7.8a
21 Enhanced bus service via NW 13th Street Park-and-Ride lots @ US 441 and SR 121 UF campus and Shands area Frequent service;

limited stops

$ 2.7
22 Enhanced bus service via NW 43rd Street Park-and-Ride lots @ NW 43rd Street and NW 53rd Avenue UF campus and Shands area Frequent service;

limited stops

$ 3.8
23 NW 83rd Street NW 39th Avenue Millhopper Road New two-lane road $ 1.6
24 SW 40th Boulevard Extension SW 34th Street

(SR 121)

Archer Road

(SR 24)

New two-lane road $ 0.8
25 SW 62nd Boulevard Extension SW 40th Street SW 20th Avenue New two-lane road $ 2.0
26 Parker Road Extension Newberry Road NW 39th Avenue New two-lane road $ 1.2
27 West 6th Street SW 4th Avenue NW 8th Avenue Four-laning $ 2.0
28 SW 16th Avenue

(SR 226)

Archer Road

(SR 24)

SW 13th Street

(US 441)

Six-laning

(Restriping)

$ 0.4
29 SW 13th Street

(US 441)

SW 16th Avenue

(SR 226)

Archer Road

(SR 24)

Six-laning $ 1.0
30 NW 16th Avenue NW 13th Street

(US 441)

N Main Street

(CR 329)

Four-laning or capacity enhancement strategies

(to be determined by P.D. & E)

$ 4.8a
31 University of Florida East-West Connector SW 34th Street

(SR 121)

SW 16th Avenue

(SR 226)

Four-laning or

new four-lane road

$ 3.4
32 Williston Road

(SR 331)

Interstate 75 SW 13th Street

(US 441)

Six-laning $ 6.0
33 Newberry Road

(SR 26)

NW 107th Terrace NW 76th Boulevard Corridor capacity enhancement strategies $ 5.6

a Estimated cost Total and subtotal for road improvements includes the higher road improvement cost. G\p\mtpo\cfp2020.wpd

b Florida Department of Transportation long range planning or project, development & environment (PD&E) study estimated cost.

Denotes roadways that are eligible for State Funding.



Year 2020 Cost Feasible Plan was adopted December 14, 1995.