METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION

FOR THE GAINESVILLE URBANIZED AREA



ADOPTED YEAR 2020 COST FEASIBLE PLAN

[Legend - Shaded Projects are not funded in the Cost Feasible Plan and *Denotes Proposed to be State funded]

PRIORITY RANKING
PROJECT

FROM

TO

DESCRIPTION
ESTIMATED COST ($M)
Eligible Fund Codes
1*
PARTIALL Y FUNDED
Continue existing bus system and headways not applicable not applicable Existing Headways
$ 17.5
DDR, DS, FTA, LF

2
PARTIALLY
FUNDED

Long range transit peer evaluation study not applicable not applicable Metropolitan areawide long range transit service evaluation
$ 0.2
D, FTA, PL, LF
3*
FUNDED
Main Street Depot Avenue N 8th Avenue Reconstruct as a 2-lane divided road, including bus bays, instreet bike lanes and parallel parking
$ 6.5

DIH, , DS, DDR

4*
PARTIALL Y FUNDED
W University Avenu/ SW 2nd Avenue
(SR 26/SR 26A)
NW 38th Street North-South Drive Modifications to enhance the Westgate area, including bicycle, pedestrian and transit projects on State Roads 26/26A from W 38th Street to W 34th Street; and road, safety and landscape modifications for two-way traffic on State Roads 26/26A from W 38th Street to North-South Drive

$ 9.0
DS, DDR, XA, XL, LF

 

5*
PARTIALL Y FUNDED

SW 20th Avenue/ Hull Road Extension SW 62nd Boulevard SW 34th Street (SR 121) SW 20th Ave Charrette grid network with 2-lane Hull Rd extension; see note *.
$ 6.7
XA, XL, LF
6*
Depot Avenue Project SW 13th Street (US 441) Hawthorne Road (SR 20) Reconstruct Depot Ave Designate SW-SE 16th Ave as State Road 24; see note **.
$ 18.8
XA, XL, LF
7*
FUNDED
NW 39th Avenue
SR 222/CR 222
NW 98th Street End of 4 lane Four-laning and widen bridge
$ 12.3a
XA, XL, LF
8*
PARTIALL Y FUNDED
Enhanced bus service via SW 20th Avenue Oaks Mall (via SW 62nd Boulevard) Central UF campus Frequent service; limited stops
$ 3.8
DS, DDR, FTA, LF
9
PARTIALLY FUNDED
Enhanced bus service via Archer Road Park-and-Ride lot west of I-75 Shands area and Central UF Campus Frequent service; limited stops
$ 2.2

DS, DDR, FTA, LF

10
PARTIALLY FUNDED
Tower Road End of 4 lane End of 4 lane Two-lane facility consistent with the Tower Road/SW 24th Avenue Charrette (see approved implementation guidelines)
(to be developed)
11*
PARTIALL Y FUNDED
NW 34th Street (SR 121) W University Avenue
(SR 26)
Martin Luther King, Jr. Highway
(US 441)
Corridor capacity enhancement strategies
$ 5.0
12*
PARTIALL Y FUNDED
Enhanced bus system not applicable not applicable Minimum 30 minute peak headway
$ 13.2
13
SW 24th Avenue SW 75th Street SW 62nd Blvd Two-lane facility consistent with the Tower Road/SW 24th Avenue Charrette (see approved implementation guidelines)
(to be developed)
14*
PARTIALL Y FUNDED
Enhanced bus service via Newberry Road Tower Road/ Newberry Road/Oaks Mall Park-and-Ride lot University of Florida and Shands area Frequent service; limited stops; Park-and-Ride lot @ Oaks Mall
$ 2.7
15*

Archer Road
(SR 24)
SW 91st Street SW 75th Street (Tower Road) Four-laning
$ 4.1

16*
PARTIALLY
FUNDED

Newberry Road (SR 26) NW 76th Boulevard I - 75 Corridor capacity enhancement strategies
$ 1.0
17
NW 83rd Street NW 23rd Avenue NW 39th Avenue Four-laning
$ 2.6
18*

Archer Road
(SR 24)
Parker Road SW 91st Street

Four-laning
$ 7.2
19
NW 23rd Avenue NW 83rd Street NW 55th Street Four-laning
$ 3.6
20
NW 23rd Avenue Extension NW 143rd Street NW 98th Street New two-lane road
$ 1.5
21
SW 62nd Boulevard SW 20th Avenue End of 4 lane Four-laning
$ 1.5
22
NW 53rd Avenue NW 43rd Street US 441

Four-laning or capacity enhancement strategies (to be determined by P.D. & E)
$ 7.8a
23*
PARTIALL Y FUNDED
Enhanced bus service via NW 13th Street Park-and-Ride lots @ US 441 and SR 121 UF campus and Shands area Frequent service; limited stops
$ 2.7
24*
Enhanced bus service via NW 43rd Street Park-and-Ride lots @ NW 43rd Street and NW 53rd Avenue UF campus and Shands area Frequent service; limited stops
$ 3.8
25
NW 83rd Street NW 39th Avenue Millhopper Road New two-lane road
$ 1.6
26
SW 40th Boulevard Extension SW 34th Street(SR 121) Archer Road (SR 24) New two-lane road
$ 0.8
27
SW 62nd Boulevard Extension SW 40th Street SW 20th Avenue New two-lane road
$ 2.0
28
Parker Road Extension Newberry Road NW 39th Avenue New two-lane road
$ 1.2
29
West 6th Street SW 4th Avenue NW 8th Avenue Four-laning
$ 2.0
30*
SW 16th Avenue (SR 226) Archer Road (SR 24) SW 13th Street (US 441) Six-laning (Restriping)
$ 0.4
31*
SW 13th Street (US 441) SW 16th Avenue (SR 226) Archer Road (SR 24) Six-laning
$ 1.0
32
NW 16th Avenue

NW 13th Street (US 441) N Main Street (CR 329) Four-laning or capacity enhancement strategies (to be determined by P.D. & E)
$ 4.8a
33*
Williston Road (SR 331) Interstate 75 SW 13th Street (US 441) Six-laning
$ 6.0
34*
Newberry Road (SR 26) NW 107th Terrace NW 76th Boulevard Corridor capacity enhancement strategies
$ 5.6

a Estimated cost Total and subtotal for road improvements includes the higher road improvement cost.

*Denotes roadways that are eligible for State Funding.

Year 2020 Cost Feasible Plan was adopted December 14, 1995; amended July 22, 1998, September 9, 1999 and June 8, 2000.

RETURN HOME


METROPOLITAN TRANSPORTATION PLANNING ORGANIZATION

FOR THE GAINESVILLE URBANIZED AREA

ADOPTED YEAR 2020 COST FEASIBLE PLAN

SW 20TH AVENUE CHARRETTE GRID NETWORK - (532 KB-jpg)

DEPOT AVENUE AREA PROJECT

PHASE

The SW 20th Avenue/Hull Road-Implementation Plan was adopted on July 22, 1998 and amended on December 10, 1998

NUMBER

The Depot Avenue Area Project components were adopted on July 22, 1998
1

annual enhanced transit funding

preliminary engineering studies to identify the right-of-way that should be preserved for the bicycle/pedestrian trail and Hull Road extension

1

 

2

Traffic engineering study of critical intersections: SR 24 & SR 226; SR 24 & US 441; and SR 226 & US 441;

Redesignate SR 24 - S 16th Ave, from Archer Rd to Williston Rd and Williston Rd, from SW 16th Ave to E University Ave;

1-A

bicycle/pedestrian trail

bicycle/pedestrian grade separation at SW 34th Street

3

4

 

SE 16th Avenue widening to 4 lanes;

Reconstruct critical intersections: SR 24 & SR 226; SR 24 & US 441; and SR 226 & US 441;

1-B

SW 34th Street right-turn lane at SW 20th Avenue;

SW 20th Avenue

construct missing sidewalk
construct roundabouts

construct turnlanes
construct raised medians
construct bus bays
construct transit "super stops"

5

 

6

Depot Avenue 2-lane reconstruction with bike lanes and sidewalks, including realignment of Depot Ave and SW 9th Rd;

Maintain SW 9th Rd as a 2-lane facility, except for intersection improvements at Archer Road;

2

SW 62nd Boulevard constructed to SW 43rd Street

SW 62nd Boulevard/SW 43rd Street roundabout

SW 24th Avenue constructed east to SW 38th Terrace

SW 24th Avenue/SW 38th Terrace roundabout

SW 24th Avenue constructed east to SW 34th Street

SW 24th Avenue constructed east to Archer Road

SW 40th Terrace constructed

SW 38th Terrace constructed

7

8

SW 16th Avenue parking removal; and

North-South Drive realignment.

3 if needed, two-lane Hull Road constructed on Alternative 2-A Alignment with street amenities, including wise sidewalks, bikelanes and streetscaping    

 

RETURN HOME